​​​​​​​​​​​​​​​​Apply with Paper Ap​plication

We support renewable energy and partner with our customers to ensure safe and reliable interconnection of renewable energy into the electric grid.

Pepco strongly recommends all customers complete the Net Energy Metering and Interconnection Application through our online application​ process. However, the option remains to download a paper application from the following table and mail it in to our Green Power Connection Team. Click in the table below for the appropriate application and agreement. The nameplate capacity is the maximum output, expressed in kilowatts, of an electric generator under specific conditions designated by the manufacturer, as indicated on the nameplate physically attached to the generator.  

This table contains the current paper application forms. Applications dated July, 2015 and later will be accepted. Prior versions of the application forms should no longer be used.

​Nameplate Capacity​​Applications and Agreements for the District of Columbia

LEVEL 1 
10 KW OR LESS AND INVERTER-BASED  

INTERCONNECTION APPLICATION/AGREEMENT ​LEVEL 1  

2 MW OR LESS 
RADIAL DISTRIBUTION CIRCUIT OR SPOT NETWORK SERVING ONE CUSTOMER                                   

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4 

LEVEL 3 
AREA NETWORKS (50 KW OR LESS) 
RADIAL DISTRIBUTION CIRCUITS (10 MW OR LESS)  

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4  

LEVEL 4 
LESS THAN 10 MW AND NOT LEVEL 1, 2 OR 3  

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4 

LEVEL 1, 2, 3, AND 4    

D.C. CUSTOMER NET ENERGY METERING CONTRACT   

​ENERGY STORAGE

SUPPLEMENTAL FORM

For customers interested in Community Renewable Energy Facilities (CREF) serving multiple end users, the  Community Renewable Energy Act (CREA) of 2013 established a community net energy metering program in the District of Columbia. Click here​​​ for more information on CREF. 

District of Columb​ia Net Energy Metering Contract

Net Energy Metering applicants in the District of Columbia also must complete a Net En​ergy Metering Contract.  

​Applicatio​​​n Fees

After Pepco receives your paper application, the system automatically determines if an application fee is required and calculates the required fee, based on the jurisdiction, system size, and application level. The online system automatically creates and emails an invoice to the contractor or customer.  

​Nameplate Capacity​Application Fee

LEVEL 1 
10 KW OR LESS AND INVERTOR-BASED 

NONE

LEVEL 2 
2 MW OR LESS  
RADIAL DISTRIBUTION CIRCUIT OR 
SPOT NETWORK SERVING ONE CUSTOMER

$500

LEVEL 3 
AREA NETWORKS (50 KW OR LESS) 
RADIAL DISTRIBUTION CIRCUITS (10 MW OR LESS) 

$500

LEVEL 4 
LESS THAN 10 MW AND NOT LEVEL 1, 2 OR 3 

​$1,000​

Other For​​​ms

Pepco will communicate with you during the application process if an Interconnection Feasibility Study Agreement or Interconnection Facilities Study Agreement is needed. 

© Potomac Electric Power Company, 2018. All Rights Reserved.