​​​​​​​​​​Apply with Paper Application

We support renewable energy and partner with our customers to ensure safe and reliable interconnection of renewable energy into the electric grid.

Pepco strongly recommends all customers complete the Net Energy Metering and Interconnection Application through our online application proce​​ss. However, the option remains to download a paper application from the following table and mail it in to our Green Power Connection Team. Click in the table below for the appropriate application and agreement. The nameplate capacity is the maximum output, expressed in kilowatts, of an electric generator under specific conditions designated by the manufacturer, as indicated on the nameplate physically attached to the generator.  

This table contains the current paper application forms. Applications dated July, 2015 and later will be accepted. Prior versions of the application forms should no longer be used.

NAMEPLATE​ CAPACITY

APPLICATIONS AND AGREEMENTS FOR MARYLAND

LEVEL 1 
20 KW OR LESS AND INVERTER-BASED

​INTERCONNECTION APPLICATION/AGREEMENT LEVEL 1 

LEVEL 2 
2 MW OR LESS 
RADIAL DISTRIBUTION CIRCUIT OR SPOT NETWORK SERVING ONE CUSTOMER

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4 

LEVEL 3 
AREA NETWORKS  (50 KW OR LESS) 
RADIAL DISTRIBUTION CIRCUITS (10 MW OR LESS)

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4 

LEVEL 4 
 10 MW OR LESS AND NOT LEVEL 1, 2 OR 3

INTERCONNECTION APPLICATION/AGREEMENT LEVEL 2 TO 4 

AGGREGATED NET ENERGY ​​METERING ​(ANEM)

APPLICATION FOR PEPCO MARYLAND ANEM RIDER

COMBINED HEAT AND POWER  

COMBINED HEAT AND POWER INTERCONNECTION APPLICATION AND AGREEMENT

 ENERGY STORAGE

 SUPPLEMENTAL FORM

 

​​​

Customers requesting Aggregated Net Energy Metering will need to submit the appropriate-level Interconnection Application and Agreement plus the ANEM application rider. Information on the newly developing community net energy metering program in Maryland also is available.  

Application Fees

After Pepco receives your paper application, the system automatically determines if an application fee is required and calculates the required fee, based on the jurisdiction, system size, and application level. The online system automatically creates and emails an invoice to the contractor or customer.  

NAMEPLATE CAPACITY

APPLICATION FEE

 LEVEL 1 
20 KW OR LESS AND INVERTER-BASED

NO FEE

LEVEL 2  
2 MW OR LESS  
RADIAL DISTRIBUTION CIRCUIT OR SPOT NETWORK SERVING 
ONE CUSTOMER 

$50 + $1 PER AC INVERTER RATING KW 

LEVEL 3 
AREA NETWORKS (50 KW OR LESS) 
RADIAL DISTRIBUTION CIRCUITS (10 MW OR LESS)

$100 +$2 PER AC INVERTER RATING KW

LEVEL 4 
10 MW OR LESS AND NOT LEVEL 1, 2, OR 3

$100 +$2 PER AC INVERTER RATING KW 

 AGGREGATED NET ENERGY METERING (ANEM)

 NO FEE

COMBINED HEAT AND POWER 

SAME AS FOR LEVEL 2, 3, OR 4


Other Forms​

Pepco will communicate with you during the application process if the following documents are needed.

© Potomac Electric Power Company, 2018. All Rights Reserved.